A Closer look at the Isolating Stablizers
|
|
|
|
Inside the Control Room from front to back
|
|
|
|
Lining the rear wall with mineral fiber
|
|
|
|
Future Vocal/Iso Booth
|
|
|
|
|
Future Live/Tracking Room
|
|
|
|
Air tight and ready for trim
|
|
|
|
|
|
|
Building the rear bass traps.
|
|
|
|
|
Temporary Treatment while building the soffets and perforated resonators.
|
|
|
|
|
|
Bringing down the lights
|
|
|
|
|
Installing the Speaker Soffits
|
|
|
|
Left Speaker
|
|
|
|
|
Right Speaker
|
|
|
|
A perforated resonator will finish off the outsides
|
|
|
|
Installed speaker connections inside soffit. XLR and switched outlet.
|
|
|
|
Combined left and right speaker connections with a twist lock power feed.
|
|
|
|
|
Framing for perforated resonators and installation of inside control room windows complete, as well as installation of bass hangers.
|
|
|
|
Front of control room with ambient lighting.
|
|
|
|
Front some trim work done.
|
|
|
|
ISO Booth
Newly framed and door hung.
|
|
|
|
|
|
|
|
|
|
|
|
|
Start of Live Room:
Installation of interior and exterior sole plates, plus exterior wall cleat.
|
|
|
|
|
|
Live Room
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|